Installations for concrete products - Transportation group

Transportation groupThe transportation group serves for automatic transportation of technological boards between the production line and the curing hall.

It consist of two main devices:

  • platform
  • multi level fork lift

The platform travels using main railways situated at a right angle to the production line and the curing hall axis. It consists of a socket which hosts the fork lift travelling into curing hall racks.

The transportation group receives stacked base boards with products from the stacker and transports them to the curing hall. After a suitable period of time the boards with ready products are taken out from the curing hall and transported to the de-stacker. The whole process is fully automatic.

We offer both new and used transportation groups as well as a spare parts and devices.